Username: Password:
 
News at Eagle Rock Timber

MAY 2009 - Lewandowski Farm

The wind turbines at Lewandowski Farms near Mountain Home, Idaho have been donated to colleges in southern Idaho where they will be used to train wind turbine technicians. One turbine was donated to College of Southern Idaho (CSI) and two were donated to Idaho State University’s Energy Systems Technology and Education Center (ISU ESTEC). Each college will use one turbine and tower for training purposes. Additionally, one turbine will be refurbished and used to generate electricity near ISU ESTEC. A broad collaboration of industry partners donated money, time and equipment to lower, disassemble, ship and refurbish the turbines.  Eagle Rock Timber's role was to disassemble the three turbines and transport them to the colleges.

Donors include:
· Lewandowski Farms, LLC
· Ridgeline Energy, LLC
· Eagle Rock Timber, Inc. 
· Tidwell Idaho Foundation
· Frontier Pro Services
· enXco Service Corporation
· Hytorc
 
For more on this story view the below links.
http://www.kidk.com/news/46411107.html
http://www.idahobusiness.net/archive.htm/2009/06/01/Wind-for-a-generation-From-humble-start-to-mega-what-ifs
http://videos.magicvalley.com/p/video?id=4288419
http://www.magicvalley.com/articles/2009/05/27/news/top_story/162747.txt
http://www.ktvb.com/news/magicvalley/stories/ktvbn-may1909-wind_turbines.1b66bc44.html
http://www.localnews8.com/Global/story.asp?s=10441213

 

APRIL 2009 - Radiochemistry Laboratory (RCL) loacted at the Materials & Fuel Complex (MFC) at Idaho National Laboratory (INL) Post Register
This projects is a design/build laboratory with Eagle Rock Timber, Inc. performing as the General Contractor.  Captured was the stack being lifted and set in place on the facility. The laboratory's scheduled completion date is June 20, 2009.

APRIL 2009 - Sugar City Bike Path  Post Register
The path completed in April open for public use for the spring of 2009.

FEB. 2009 - Windy Points Wind Farm - "Winds of Change" Post Register
 Highlights the adaptability of Eagle Rock Timber, and the choices made to proceed in the wind industry.  Discusses the completion of 20 - 2megawatt RePower Turbines in Goldendale Washington.